Integrated Farm Biosecurity: Wash · Disinfect · Dry · Detect
P01 · 20 MPa Telescopic Trailer Washer

Livestock Trailer Interior Wash System

Manual lancing inside wet hog trailers burns hours and misses upper decks. One 12 m P01 arm washes up to 3 lanes at 20 MPa from outside.

20 MPa120 L/min Scouring Power
12 m × 3.5 mTelescopic Reach & Lift
5 kW (380V)Drive Power Rating
3 LanesSingle-Arm Rail Coverage
Telescopic Arm Livestock Trailer Interior Cleaning System
System Overview

Keep Crews Outside Multi-Deck Hog Trailers

BioFortis P01 livestock trailer interior wash system drives a 12 m telescopic boom with 3.5 m lift and 6-hole 360° rotating nozzles through multi-tier decks at 20 MPa and 120 L/min. One 5 kW overhead transfer carriage serves up to 3 parallel wash lanes while operators work safely inside a glass cabin.

Last reviewed: November 2026 · Engineering Specification Rev. 2.5
20 MPa2,900 PSI Impact Pressure
12 mMax Horizontal Extension
3.5 mVertical Deck Lift Range
3 LanesLateral Overhead Rail Span
Deployment Tiers

One Arm Across One, Two, or Three Lanes

Start with a dedicated single bay or mount one P01 carriage across up to three wash lanes to cut equipment cost.

Tier 1 · Single Lane

Standard 1-Lane Interior Bay

Dedicated wash bay for medium commercial farms processing 6–12 livestock trailers per day.

  • 1 × P01 Telescopic Arm (12 m reach, 3.5 m lift)
  • Paired with P04 60 kW IoT Main Pumping Unit
  • One-touch automated interior wash & foam cycle
Quote Single-Lane Bay
Tier 3 · Mega Integrator

3-Lane Regional C&D Center

Maximum CAPEX efficiency: one telescopic arm traverses 3 parallel lanes handling 25–40+ trailers/day.

  • Full 3-lane lateral overhead rail coverage per arm
  • Supports multi-layer trailers & air-filtered pig trucks
  • Direct downstream link to P05 700–800 kW Drying Rooms
Quote 3-Lane Center
How It Works

Zero Interior Blind Spots at 20 MPa

6-Hole 360° Nozzles Strip Caked Ceilings

6-Hole 360° Nozzles Strip Caked Ceilings

Hand wands struggle to blast overhead pen gates and tight slatted deck seams on triple-deck rigs. Our 6-hole rotary head spins across 360 degrees at 20 MPa and 120 L/min along 12 m of trailer length before disinfectant even touches the steel.

20 MPaFull Deck Scouring
120 L/minHigh-Volume Flush
One Overhead Rail Feeds Up to 3 Bays

One Overhead Rail Feeds Up to 3 Bays

Buying three separate interior washers triples maintenance and capital cost. Mounting P01 on an overhead steel transfer rail lets one boom glide into Bay 2 while Bay 1 foams or pulls forward.

3 LanesOne Arm Covers Three Bays
5 kWLow-Power Rail Drive
Clean Glass Cabin Replaces Ammonia Exposure

Clean Glass Cabin Replaces Ammonia Exposure

Workers quit fast when forced inside humid trailers soaked in caustic disinfectant spray. From an elevated glass cabin, one operator launches automatic programs or steers by joystick.

0 EntryWorkers Stay Outside
>50%Faster Trailer Turnaround
System Layout

Four Core Assemblies on the P01 Arm

12 m Rigid Telescopic Boom & 3.5 m Lift

Precision-guided corrosion-resistant boom extends cleanly into multi-deck hog and air-filtered trailers.

6-Hole 360° Rotating Nozzle Head

High-impact 20 MPa stainless rotary assembly eliminates blind spots on ceilings, gates, and floor slats.

Telescopic Arm Livestock Trailer Interior Cleaning System structural breakdown
5 kW 3-Lane Overhead Transfer Rail

Heavy-duty overhead carriage shifts the telescopic arm smoothly between up to 3 parallel wash lanes.

Central Glass Cabin & PLC Joystick

One-touch automated wash programs with real-time manual joystick override from a clean operator station.

Need Steel I-Beam Loads & 3-Lane CAPEX Numbers? Share trailer length and bay count to receive overhead rail CAD drawings and FOB/CIF pricing in 12 hours.
Technical Specifications

P01 Technical Specifications

Factory-verified engineering parameters for tendering and civil integration.

ParameterSpecificationNote
Working VoltageAC 380V / 50Hz3-Phase; 60Hz export motor customization available
Drive Power5 kWPowers telescopic extension, lift, and lateral rail travel
Working Water Pressure20 MPa (2,900 PSI)Supplied by P04 60 kW IoT Main Pumping Unit
Water Supply Flow120 L/minSustains full-impact 6-hole 360° rotary scouring
Max Extension & Lift Height12 m Length × 3.5 m HeightCovers full multi-deck trailer length and upper decks
Control Mode & Lane CoverageOne-Touch Auto / Cabin Remote | 3 LanesSuitable for multi-layer trailers & air-filtered pig trucks
Sizing & Site Prep

Plan Bay Steel, Flow & Maintenance

Interactive Engineering Tool

Truck Wash & Thermal Drying Hub Sizing Calculator

Estimate required wash lanes, 700–800 kW drying chambers, daily water demand, and 380V electrical load for your biosecurity center.

Recommended Wash Bays (20 MPa)--
Recommended Drying Rooms--
Estimated Wash Water Demand--
Estimated Connected Load--
“One missed patch of dried manure on an upper deck shields ASFV from disinfectant. Let 20 MPa automation take over the dirtiest job in the yard.”
BioFortis Vehicle Decontamination Engineering · Proven in Multi-Site Vietnam Deployments
Common Field Problems

Four Interior Wash Problems Solved

Field Problem

Upper-Deck Blind Spots & High Turnover

How BioFortis Solves It

Automated 12 m telescopic boom reaches every deck while staff stay inside a clean control cabin.

Field Problem

Tripled Capital Cost on Multi-Lane Hubs

How BioFortis Solves It

One overhead rail-mounted P01 arm services up to 3 parallel wash lanes automatically.

Field Problem

Burst High-Pressure Hoses From Kinking

How BioFortis Solves It

Guided boom hose tracks and stainless swivels stop sharp bends and floor dragging.

Field Problem

Low Pressure Leaving Organic Bedding Behind

How BioFortis Solves It

20 MPa flow at 120 L/min strips dried manure before chemical virucides contact bare steel.

Delivery Process

Five Steps to Launch Your Wash Bay

01

Trailer & Bay Assessment

Review trailer deck geometry, door heights, and target 1–3 lane hub layout.

Day 1–2
02

Overhead Rail & Utility CAD

Deliver structural steel beam load drawings, 380V schematics, and trench layouts.

Day 3–7
03

20 MPa Full-Pressure FAT

Test telescopic extension, 3.5 m lift, 3-lane rail travel, and 20 MPa spray with video proof.

Week 3–5
04

Export Container Packing

Pack pre-tested boom, rail carriage, control cabin console, and 12-month spare kit.

Week 5–6
05

PLC Commissioning & Training

Complete on-site or remote calibration of one-touch programs and operator SOP handover.

On-Site
Commissioned Across Three Vietnam Pig Sites
Field Track Record

Commissioned Across Three Vietnam Pig Sites

A Leading Integrated Commercial Swine Producer in Vietnam installed overhead rail-mounted P01 telescopic interior washers across 3 commercial pig facilities. Continuous 20 MPa / 120 L/min scouring cut trailer wash turnaround time by over 50%.

Testing & Export Docs

Factory Test Video and Civil CAD Pack

DOC-01

20 MPa Full-Pressure FAT Log

Factory test video and report verifying 12 m extension, lift, rail travel, and nozzle pressure.

Included
DOC-02

Overhead Rail & Civil CAD

DWG/PDF structural beam loads, bay dimensions, drainage trenches, and 380V wiring diagrams.

Included
DOC-03

English PLC & Joystick SOP

Operator manual covering one-touch automated cycles, manual override, and safety interlocks.

Included
DOC-04

Customs & 12-Month Spare BOM

Export invoices, HS codes, and itemized rotary nozzle, swivel seal, and limit-switch spares.

Included
10 Common Questions

Common Questions on Telescopic Trailer Washers

01How long does an automated livestock trailer interior washout take with P01?
By delivering 20 MPa at 120 L/min through 6-hole 360° rotating jets, the P01 cuts per-trailer turnaround time by over 50% compared to manual lancing, typically completing interior scouring in 10–20 minutes depending on deck count and manure load.
02How does one telescopic arm interior washer lower CAPEX across multiple lanes?
The P01 travels laterally on an overhead rail spanning up to 3 parallel wash bays, allowing one 5 kW interior machine to service three lanes instead of buying three separate units.
03What types of livestock trailers can the P01 clean?
With 12 m horizontal extension and 3.5 m vertical lift adjustment, the P01 is engineered for multi-layer hog trailers, air-filtered breeding-stock trucks, and standard commercial livestock haulers.
04How does the 6-hole 360° rotating nozzle reach trailer ceilings and corners?
As the telescopic boom advances down each deck, hydraulic reaction spins the 6-hole stainless nozzle head through a full 360-degree sphere, hitting upper pen gates, ceiling corners, and slatted floor seams simultaneously.
05Do workers still need to climb inside the trailer during operation?
No. Operators supervise the entire cycle from a clean central glass control cabin using one-touch automated programs with optional remote joystick override for heavy spot cleaning.
06What high-pressure pumping unit is required to power the P01?
The P01 pairs directly with our P04 60 kW IoT Main High-Pressure Pumping Unit (20 MPa, 120 L/min), which can also synchronize with the P02 exterior gantry and P03 chassis washer.
07Can the P01 operate on 60Hz electrical grids in overseas markets?
Yes. Standard units run on AC 380V / 50Hz (5 kW drive load), and BioFortis configures 60Hz motors and VFD controls for Latin American, Southeast Asian, and North American export projects.
08What ceiling height and overhead structural support are needed for installation?
BioFortis supplies full DWG/PDF structural load drawings during Step 2 (Day 3–7) specifying overhead I-beam load capacity and bay clearances tailored to your fleet height.
09How does interior trailer washing integrate with thermal drying?
Once the P01 completes 20 MPa interior scouring and chemical disinfection, the trailer moves directly forward into a P05 700–800 kW thermal drying room to reach 70°C+ for verified ASFV inactivation.
10What wear parts should a wash center stock for 12 months of P01 operation?
We recommend stocking rotary nozzle tips, high-pressure swivel seal kits, limit switches, and spare flexible hoses, all bundled in our 12-month OEM spare kit.
Talk to an Engineer

Request Overhead Rail CAD & Quote

Tell us your trailer deck count and daily trucks to receive beam load drawings and a 12-hour FOB/CIF quote.

Related Equipment

Direct Engineering Desk · 12-Hour Response

Request a Quote & CAD Layout

Dual-channel submission (Web3Forms + direct server backup). Share your herd scale, truck volume, or utility specs for a tailored CAD layout and FOB/CIF quotation.