Full Site High Pressure Cleaning System
Keep 380V cables and muddy carts out of wet farrowing rooms. P07 pipes 20 MPa hot water to every drop, cutting wash labor up to 50%.

Dry Plant Room, Fixed Stainless Barn Drops
BioFortis P07 full site high pressure cleaning system keeps 7.5–60 kW VFD pump skids, 3-stage filtration, and 100°C boilers isolated inside a dry utility room. Only fixed 304/316L manifolds enter barns, holding ≤20 MPa and ≤350 L/min across up to 12+ lances while cutting wash sewage up to 40%.
Size Pump kW by Simultaneous Wash Guns
Pick the VFD skid tier that matches how many crews wash rooms at the same time during turnarounds.
7.5–15 kW Central Skid (2–4 Simultaneous Guns)
Compact centralized pump station for 1,200–2,400 sow breeding or finishing farms replacing portable cold washers.
- 100% water-electricity separation inside all wet barns
- 3-stage water softener, bag & PP cotton pre-filtration
- 304 SS overhead piping with quick-connect barn drops
22–37 kW Multi-Pump VFD Station (4–8 Simultaneous Guns)
High-efficiency VFD multi-pump plant room for 2,500–10,000 sow commercial sites with 120 kW hot-water integration.
- Auto pump staging holds steady 20 MPa across rooms
- Supports cold water, 100°C hot water, foam & dosing
- Cuts room washout time 35–50% and sewage up to 40%
45–60 kW Flagship Station (Up to 350 L/min, 8–12+ Guns)
Industrial multi-pump centralized cleaning hub engineered for mega sow complexes, abattoirs, and C&D hubs.
- Full ≤350 L/min flow capacity with duty redundancy
- Integrated 1:50–1:500 downstream corrosion-free dosing
- Complete P&ID piping design & export commissioning
Constant 20 MPa Flow Without Pump Damage
Squeeze the Lance Trigger, VFD Starts
Operators plug a light stainless lance into the room's quick-connect drop instead of dragging heavy 380V carts over wet slats. Trigger flow starts the plant-room VFD automatically, keeping electricity out of wet barns.
Three Filter Stages Save Pump Plungers
Unfiltered bore water scores ceramic plungers and scales 100°C boiler coils in months. P07 puts a water softener, bag filter, and PP cotton filter ahead of the stainless buffer tank.
Downstream Boilers & Dosers Protect Seals
Pumps only move clean water. Pressurized output passes downstream through 120 kW boilers (up to 100°C) and 1:50–1:500 chemical injectors so caustic disinfectants never touch plunger heads.
Four Parts of a P07 Plant Room
Water softener, bag filter, and PP cotton filter remove silt and hardness before the buffer tank.
Automatic pump staging maintains rock-steady ≤20 MPa pressure from 1 to 12+ active lances.
Corrosion-proof stainless steel headers with drip-free quick-connect drops in every barn room.
100°C hot-water coil and 1:50–1:500 proportional injection keep corrosive chemicals out of pumps.
P07 Technical Specifications
Verified factory specifications for the BioFortis P07 centralized cleaning station, ready for EPC utility schedules and tender documents.
| Parameter | Specification | Note |
|---|---|---|
| Rated Voltage | AC 380V / 50Hz | 3-phase industrial supply (60Hz configurable on export order) |
| Max Electric Power | 7.5–60 kW | Modular VFD multi-pump staging matched to active gun count |
| Working Water Pressure | ≤ 20 MPa (2,900 PSI) | Constant manifold pressure regardless of active drop count |
| Working Flow Rate | ≤ 350 L/min | Supports multi-room simultaneous barn washout |
| Max Outlet Water Temp | 100°C (with central boiler) | Pairs with P09 Diesel, P10 Natural Gas, or P11 Electric boilers |
| Integrated Dosing Range | 1:50 – 1:500 | Downstream injection protects ceramic plunger pump heads |
| Filtration Pre-Treatment | Water softener + bag filter + PP cotton filter | Prevents mineral scaling and abrasive grit seal wear |
Plan Room Size, Drops & Filter Care
Civil, Electrical & Piping Interface Checklist
- Locate the central skid in a dry, frost-protected utility room with AC 380V 3-phase power and floor drainage.
- Install a stainless buffer tank sized for 30–60 minutes of peak washout demand downstream of the 3-stage filter.
- Slope 304/316L overhead headers cleanly with isolation ball valves per barn wing and quick-connect drops every 12–15 m.
Full AutoCAD (.DWG) and PDF foundation layouts are delivered within 5 business days of order confirmation.
Preventive Maintenance & Wear-Part Intervals
- Replenish water softener regeneration salt weekly and inspect bag/PP cotton filter pressure differential bi-weekly.
- Change triplex plunger pump crankcase oil after the first 50 hours and every 500 operating hours thereafter.
- Inspect quick-connect O-rings, ceramic plunger water seals, and rotating turbo nozzles quarterly.
Need consolidated 12-month wear-part kits? See our Genuine Spare Parts Program
Four Barn Washdown Hazards Removed
380V Electrocution in Wet Barns
100% water-and-electricity separation removes all power cords and electrical panels from wet animal rooms.
Cross-Barn PEDV & PRRS Carryover
Fixed room drops eliminate rolling manure-coated portable washers between farrowing and nursery buildings.
Pressure Drops During Peak Washing
Multi-pump VFD staging maintains constant 20 MPa whether 1 operator or 12 operators squeeze triggers simultaneously.
Hard-Water Scaling & High Sewage Costs
3-stage filtration protects seals while 20 MPa hot-water scouring cuts barn wash sewage volume by up to 40%.
Five Steps to Fixed Barn Wash Piping
Barn Layout Review
Map building lengths, simultaneous wash guns, and raw well-water hardness.
Piping P&ID & CAD
Deliver 304 SS header sizing, drop spacing, and plant-room utility drawings.
Full-Pressure FAT
Test VFD multi-pump staging and pressure stability at 20 MPa before crating.
Export Containerization
Pack pump skids, filters, manifolds, lances, and 12-month wear kits together.
Pressure Test & SOP
Support on-site or remote manifold hydrostatic testing and operator training.
Central Pump & Dosing Rooms in Vietnam
A Leading Integrated Commercial Swine Producer in Vietnam commissioned BioFortis centralized pumping skids, stainless buffer tanks, and dosing rooms at 3 breeding and finishing farms, cutting room turnaround time by over 50%.
P&ID Layouts, FAT Logs & Spare Lists
20 MPa Multi-Pump FAT Report
Recorded VFD staging curve, flow verification, and hydrostatic leak test.
Barn Piping P&ID & CAD Layout
DWG/PDF plant-room footprint, header diameters, and drop-point schedule.
English Plant & Filtration SOP
Step-by-step operating guide, softener regeneration, and 500h pump maintenance.
Export Docs & 12-Month Spare BOM
Customs pack plus recommended filter cartridges, water seals, and quick couplers.
Common Questions on Centralized Barn Cleaning
01How does the P07 system achieve 100% water-and-electricity separation inside pig barns?
02Is it worth rebuilding portable washers versus installing a centralized P07 pipeline?
03How much labor and farm sewage volume does 20 MPa centralized hot-water washing save?
04Can multiple barn operators wash simultaneously without losing line pressure?
05Why are water softening, bag filtration, and PP cotton filtration integrated upstream?
06Can the same stainless pipeline carry cold water, 100°C hot water, foam, and disinfectant?
07How are corrosive disinfectants kept from damaging the main high-pressure plunger pumps?
08How does P07 work alongside the P08 Full-Site Low-Pressure Disinfection System?
09What electrical power and voltage options are available for overseas farms?
10Do you supply the stainless steel pipes, quick couplers, and lances in one shipment?
Request a Barn Piping CAD & Quote
Share your building count, simultaneous gun target, and water source for a P07 pump skid and piping quote.
Related Equipment
Request a Quote & CAD Layout
Dual-channel submission (Web3Forms + direct server backup). Share your herd scale, truck volume, or utility specs for a tailored CAD layout and FOB/CIF quotation.