Integrated Farm Biosecurity: Wash · Disinfect · Dry · Detect
P07 · In-Barn Stainless Washdown Line

Full Site High Pressure Cleaning System

Keep 380V cables and muddy carts out of wet farrowing rooms. P07 pipes 20 MPa hot water to every drop, cutting wash labor up to 50%.

≤ 20 MPaConstant Line Pressure
≤ 350 L/minMulti-Gun Peak Flow
7.5–60 kWVFD Staged Pump Skid
Up to 40%Sewage Volume Saved
Full-Site Centralized High-Pressure Cleaning System (≤20 MPa)
System Overview

Dry Plant Room, Fixed Stainless Barn Drops

BioFortis P07 full site high pressure cleaning system keeps 7.5–60 kW VFD pump skids, 3-stage filtration, and 100°C boilers isolated inside a dry utility room. Only fixed 304/316L manifolds enter barns, holding ≤20 MPa and ≤350 L/min across up to 12+ lances while cutting wash sewage up to 40%.

Last reviewed: November 2026 · Engineering Specification Rev. 2.5
≤ 20 MPaHigh-Impact Manure Scour
≤ 350 L/minUp to 12+ Active Lances
35–50%Barn Wash Labor Saved
100°C MaxCentral Boiler Integration
Deployment Tiers

Size Pump kW by Simultaneous Wash Guns

Pick the VFD skid tier that matches how many crews wash rooms at the same time during turnarounds.

Tier 1 · Mid-Size Site

7.5–15 kW Central Skid (2–4 Simultaneous Guns)

Compact centralized pump station for 1,200–2,400 sow breeding or finishing farms replacing portable cold washers.

  • 100% water-electricity separation inside all wet barns
  • 3-stage water softener, bag & PP cotton pre-filtration
  • 304 SS overhead piping with quick-connect barn drops
Quote Mid-Size Skid
Tier 3 · Mega Integrator

45–60 kW Flagship Station (Up to 350 L/min, 8–12+ Guns)

Industrial multi-pump centralized cleaning hub engineered for mega sow complexes, abattoirs, and C&D hubs.

  • Full ≤350 L/min flow capacity with duty redundancy
  • Integrated 1:50–1:500 downstream corrosion-free dosing
  • Complete P&ID piping design & export commissioning
Request Turnkey P&ID
How It Works

Constant 20 MPa Flow Without Pump Damage

Squeeze the Lance Trigger, VFD Starts

Squeeze the Lance Trigger, VFD Starts

Operators plug a light stainless lance into the room's quick-connect drop instead of dragging heavy 380V carts over wet slats. Trigger flow starts the plant-room VFD automatically, keeping electricity out of wet barns.

0 CablesInside Wet Barns
35–50%Faster Turnaround
Three Filter Stages Save Pump Plungers

Three Filter Stages Save Pump Plungers

Unfiltered bore water scores ceramic plungers and scales 100°C boiler coils in months. P07 puts a water softener, bag filter, and PP cotton filter ahead of the stainless buffer tank.

3-StageSoftener + Bag + PP
≤ 350 L/minPeak Capacity
Downstream Boilers & Dosers Protect Seals

Downstream Boilers & Dosers Protect Seals

Pumps only move clean water. Pressurized output passes downstream through 120 kW boilers (up to 100°C) and 1:50–1:500 chemical injectors so caustic disinfectants never touch plunger heads.

100°C MaxOutlet Temp
1:50–1:500Dosing Range
System Layout

Four Parts of a P07 Plant Room

3-Stage Water Pre-Treatment

Water softener, bag filter, and PP cotton filter remove silt and hardness before the buffer tank.

7.5–60 kW VFD Multi-Pump Skid

Automatic pump staging maintains rock-steady ≤20 MPa pressure from 1 to 12+ active lances.

Full-Site Centralized High-Pressure Cleaning System (≤20 MPa) structural breakdown
304/316L Overhead Piping

Corrosion-proof stainless steel headers with drip-free quick-connect drops in every barn room.

Downstream Boiler & Dosing

100°C hot-water coil and 1:50–1:500 proportional injection keep corrosive chemicals out of pumps.

New Sow Farm or Piping Retrofit? Send your barn plan and gun count for a stainless header P&ID, pump sizing, and 12-hour FOB/CIF quote.
Technical Specifications

P07 Technical Specifications

Verified factory specifications for the BioFortis P07 centralized cleaning station, ready for EPC utility schedules and tender documents.

ParameterSpecificationNote
Rated VoltageAC 380V / 50Hz3-phase industrial supply (60Hz configurable on export order)
Max Electric Power7.5–60 kWModular VFD multi-pump staging matched to active gun count
Working Water Pressure≤ 20 MPa (2,900 PSI)Constant manifold pressure regardless of active drop count
Working Flow Rate≤ 350 L/minSupports multi-room simultaneous barn washout
Max Outlet Water Temp100°C (with central boiler)Pairs with P09 Diesel, P10 Natural Gas, or P11 Electric boilers
Integrated Dosing Range1:50 – 1:500Downstream injection protects ceramic plunger pump heads
Filtration Pre-TreatmentWater softener + bag filter + PP cotton filterPrevents mineral scaling and abrasive grit seal wear
Sizing & Site Prep

Plan Room Size, Drops & Filter Care

Interactive Dosing Tool

Disinfectant & Medicator Proportioning Calculator

Calculate exact chemical concentrate consumption and select the right BioFortis proportional medicator for your barn pipeline.

Concentrate Injection Rate--
Daily Chemical Requirement--
Recommended Medicator--
“Lock motors and 380V panels inside a dry utility room. Put nothing heavier than a stainless quick-connect lance inside wet farrowing crates.”
BioFortis Central Sanitation Engineering Team
Common Field Problems

Four Barn Washdown Hazards Removed

Field Problem

380V Electrocution in Wet Barns

How BioFortis Solves It

100% water-and-electricity separation removes all power cords and electrical panels from wet animal rooms.

Field Problem

Cross-Barn PEDV & PRRS Carryover

How BioFortis Solves It

Fixed room drops eliminate rolling manure-coated portable washers between farrowing and nursery buildings.

Field Problem

Pressure Drops During Peak Washing

How BioFortis Solves It

Multi-pump VFD staging maintains constant 20 MPa whether 1 operator or 12 operators squeeze triggers simultaneously.

Field Problem

Hard-Water Scaling & High Sewage Costs

How BioFortis Solves It

3-stage filtration protects seals while 20 MPa hot-water scouring cuts barn wash sewage volume by up to 40%.

Delivery Process

Five Steps to Fixed Barn Wash Piping

01

Barn Layout Review

Map building lengths, simultaneous wash guns, and raw well-water hardness.

Day 1–2
02

Piping P&ID & CAD

Deliver 304 SS header sizing, drop spacing, and plant-room utility drawings.

Day 3–7
03

Full-Pressure FAT

Test VFD multi-pump staging and pressure stability at 20 MPa before crating.

Week 3–4
04

Export Containerization

Pack pump skids, filters, manifolds, lances, and 12-month wear kits together.

FOB / CIF
05

Pressure Test & SOP

Support on-site or remote manifold hydrostatic testing and operator training.

24h SLA
Central Pump & Dosing Rooms in Vietnam
Field Track Record

Central Pump & Dosing Rooms in Vietnam

A Leading Integrated Commercial Swine Producer in Vietnam commissioned BioFortis centralized pumping skids, stainless buffer tanks, and dosing rooms at 3 breeding and finishing farms, cutting room turnaround time by over 50%.

Testing & Export Docs

P&ID Layouts, FAT Logs & Spare Lists

DOC-01

20 MPa Multi-Pump FAT Report

Recorded VFD staging curve, flow verification, and hydrostatic leak test.

Included
DOC-02

Barn Piping P&ID & CAD Layout

DWG/PDF plant-room footprint, header diameters, and drop-point schedule.

Included
DOC-03

English Plant & Filtration SOP

Step-by-step operating guide, softener regeneration, and 500h pump maintenance.

Included
DOC-04

Export Docs & 12-Month Spare BOM

Customs pack plus recommended filter cartridges, water seals, and quick couplers.

Included
10 Common Questions

Common Questions on Centralized Barn Cleaning

01How does the P07 system achieve 100% water-and-electricity separation inside pig barns?
All electric motors, VFD drives, pressure switches, and AC 380V control cabinets remain permanently inside a dry mechanical plant room. Only pressurized stainless steel water pipes enter the animal houses, eliminating electrical shock hazards and moisture corrosion.
02Is it worth rebuilding portable washers versus installing a centralized P07 pipeline?
For farms above 1,000 sows, centralized piping pays back rapidly. Rebuilding portable washers does not solve cross-barn pathogen tracking, cable hazards, or 35–50% longer wash times; a centralized VFD skid cuts labor, water usage, and pump downtime simultaneously.
03How much labor and farm sewage volume does 20 MPa centralized hot-water washing save?
Replacing cold portable units with centralized 20 MPa hot-water manifolds cuts barn washout labor time by 35–50% and reduces total farm wash sewage discharge by up to 40%, directly lowering lagoon and effluent treatment costs.
04Can multiple barn operators wash simultaneously without losing line pressure?
Yes. The P07 multi-pump VFD station monitors manifold pressure continuously and stages pumps up or down automatically up to 350 L/min, keeping nozzle impact constant whether 1 or 12 workers are washing at once.
05Why are water softening, bag filtration, and PP cotton filtration integrated upstream?
Farm bore water frequently contains sand, rust, and calcium/magnesium hardness. Three-stage pre-treatment removes suspended solids that score ceramic plungers and prevents mineral scale from clogging 100°C boiler coils and high-pressure nozzles.
06Can the same stainless pipeline carry cold water, 100°C hot water, foam, and disinfectant?
Yes. High-pressure 304/316L stainless headers handle cold pre-rinse, 60–100°C hot-water grease stripping, alkaline foaming, and 1:50–1:500 disinfection cleanly through quick-connect drops without needing duplicate piping.
07How are corrosive disinfectants kept from damaging the main high-pressure plunger pumps?
Disinfectants and foaming agents are injected strictly downstream of the pump discharge via a P13 316L high-pressure medicator or localized P16 zero-power Venturi carts at each barn drop, ensuring only clean water touches pump seals.
08How does P07 work alongside the P08 Full-Site Low-Pressure Disinfection System?
P07 handles heavy 20 MPa mechanical removal of dried manure and biofilm during empty-barn washouts. P08 complements it with automated, time-slotted ≤5 bar misting and ≤18 bar spraying across corridors, loading chutes, and terminal disinfection cycles.
09What electrical power and voltage options are available for overseas farms?
P07 skids scale from 7.5 kW to 60 kW on standard AC 380V / 50Hz three-phase power, with 60Hz VFD and motor configurations supplied for Latin American, Philippine, and North American grids.
10Do you supply the stainless steel pipes, quick couplers, and lances in one shipment?
Yes. BioFortis delivers turnkey packages including the pump skid, 3-stage filtration, buffer tank, 304/316L piping fittings, quick-connect drops, ergonomic lances, and 12-month wear-part kits in one consolidated shipment.
Direct Engineering Desk · 12-Hour Response

Request a Quote & CAD Layout

Dual-channel submission (Web3Forms + direct server backup). Share your herd scale, truck volume, or utility specs for a tailored CAD layout and FOB/CIF quotation.